Pool Path Paving 4-30-19

The black top path from Woodlake drive to the pool entrance gate will be resurfaced on 04-30-19.  The path has deteriorated and needs to be resurfaced.  The water run off drain has also failed and will be replaced.  This work should only take 1 day.  The path will be blocked off and not available during that time.   

By Carmelle